A professional solution provider for industrial energy storage and electric vehicle charging piles
12
+years of experience in ESS
31,600
m²industrial park
25,000
m²manufacturing plant
ATESS' commercial DC fast chargers are renowned for their high efficiency, high reliability, and powerful power output. They are specifically designed for high-intensity usage and feature intelligent power distribution, remote monitoring, and a robust construction, ensuring maximum uptime and return on investment in commercial operations.
Our commercial DC fast charger solutions come with a powerful cloud-based management platform. This system allows you to remotely monitor station status, manage operations, set pricing, analyze usage data, and handle diagnostics for all your DC fast charging stations from a single dashboard.
Our DC fast charging stations feature an advanced smart load management system. It dynamically distributes available power among multiple chargers, preventing grid overload and optimizing energy use, which is crucial for cost-effective operation of a commercial DC fast charger site.
ATESS DC fast charging stations are designed for commercial use, offering rapid charging to maximize customer turnover, attract EV drivers, and create a new revenue stream. Their high efficiency and reliability ensure a low total cost of ownership.
DC fast charging stations directly deliver high-voltage direct current to the batteries of electric vehicles, bypassing the limitations of on-board chargers. This makes the charging speed much faster than AC charging, usually replenishing a large amount of power to the vehicle within 30 minutes, which is very suitable for commercial applications that require quick turnover.
DC charging supplies Direct Current directly to the battery, bypassing the EV’s onboard charger.It can reach high charging power,usually in the range of 40-480kW,or even higher.It suitable for public stations.
The fault name
BMS communication failed
Fault information







Troubleshooting and illustration

1.No gun sign.

2.CP-PE 12V.

3.SECC upgrades the latest version

The fault name
Module Fault
Fault information







Troubleshooting and illustration

1.Turn on the switch.

2.The CN17 is securely connected.

3.Check that the module address is correct.

4.Key check.
© 2024 Shenzhen ATESS Power All Rights Reserved. 粤ICP备2023127387号 by GrowthMan