Introduction

 

In the evolving landscape of energy solutions, the integration of power grid with energy storage solutions and EV charging stations, collectively known as a Grid-Connected Solar Storage Charging System, is paramount. It allows for efficient energy management by storing electricity from the grid during off-peak times and using it when demand is high, thus optimizing energy costs and ensuring a stable power supply for EV charging without incorporating solar panels or other renewable energy sources. ATESS’ involvement in the Peterborough AEA project in the UK highlights a significant opportunity to deploy a Grid-Connected Solar Storage Charging System that not only addresses specific energy challenges but also advances environmental sustainability.

 

This white paper aims to demonstrate the application and impact of the Grid-Connected Solar Storage Charging System within the AEA project in Peterborough. It provides an overview of the project's background, details the system's configuration and operation, and discusses the economic, environmental, and social benefits realized through this innovative approach.

 

Background of the AEA Project

 

The Agricultural Engineers Association (AEA), established in 1875, has long been a cornerstone of British agriculture, promoting the technical, trade, and commercial interests of manufacturers and suppliers of agricultural machinery. Over the years, AEA has evolved into a vital voice for the agricultural and outdoor power equipment sectors, representing a diverse range of manufacturers, from combine harvesters to pruning shears.

 

The AEA project in Peterborough required a substantial upgrade to its existing EV charging infrastructure, which previously relied on standard building facilities lacking specialized charging capabilities. With a current peak power requirement of 300kW for chargers, the local grid alone proved insufficient to meet this demand.

 

The project's goal was to optimize energy utilization by integrating a high-performance energy storage system alongside advanced EV chargers.


7eed296e1dec0555f5487d288b57ee93.jpg

 

Two set of 150kW ATESS EVD-150D DC EV chargers


Two set of 40 kW ATESS EVD-40S/D DC EV chargers

 

System Configuration

 

To address the grid's limitations, the system implemented at the AEA project ensures that the EVs can be charged efficiently without overloading the grid, providing a reliable and sustainable charging solution.


74756f72cf7e19e431b56979f225997e.jpg

System Configuration

 

fe29dac95609643b85339f47eb420ed2.jpg

Overall diagram

 


Operating Procedure

 

This system adopts ATESS DC coupling solution. In off-grid mode, the PCS (Power Conversion System) provides power to the EV charger using the battery as the primary energy source. During startup, both the EV charger and PCS will draw surge power, which is absorbed by the battery, thereby preventing any impact on the grid. The AC-DC rectifier module is unidirectional and can autonomously limit the input power and current to below 80A, without requiring external control mechanisms. An external sensor is employed to monitor the power and current intake at the main grid connection point. If the current exceeds 120A, the system will automatically reduce the power supplied to the EV charger and the battery charging process.

 

Note: It is crucial to ensure that the total load, including the EV chargers, remains between 80A and 120A. Exceeding 120A will trigger the 120A fuse. The battery is designed to supply power to only two 150kW EV chargers.


e25aef9ff3842db322cc33b99f85f0b5.jpg

An ATESS PCS500 battery inverter inside the ATESS container

 

 

 

Outcomes and Impact

 

The implementation of ATESS' Grid-Connected Solar Storage Charging System in the AEA project in Peterborough has resulted in significant economic, operational, and environmental benefits. By integrating advanced energy storage with EV charging infrastructure, the system has optimized energy costs by utilizing stored electricity during peak demand, ensuring a stable power supply without overloading the local grid. This innovative approach has optimized energy utilization, provided a reliable and sustainable solution, and contributed to the project’s overall efficiency and sustainability.

 

Conclusion

 

ATESS' involvement in the Peterborough AEA project demonstrates the transformative potential of Grid-Connected Solar Storage Charging Systems in modern energy infrastructure. The project not only meets the high power demands of EV charging but also supports long-term sustainability and operational efficiency. This successful integration showcases ATESS' commitment to advancing energy solutions that address contemporary challenges while paving the way for a more sustainable future.

Follow us

GET IN TOUCH

Feel free to drop us a line if you have any inquiry.

Inquire now

© 2024 Shenzhen ATESS Power All Rights Reserved.   粤ICP备2023127387号   by GrowthMan

We use cookies to personalize and enhance your browsing experience on our website. By clicking "Accept All", you agree to use cookies. You can read our Cookie Policy for more information.