A professional solution provider for industrial energy storage and electric vehicle charging piles
12
+years of experience in ESS
31,600
m²industrial park
25,000
m²manufacturing plant
All-in-one BESS
Outdoor All-in-one 125kW, 261kWh BESS cabinet with lP66/lP55 protection level, inbuilt PCS and liquid-cooling lithium-ion battery. Suitable for factory, industrial park, office, malls etc. to do peak-shaving and load-shifting. Integrated STS, can acheive on/off grid switch within 10ms.
IC261-400S Outdoor BESS cabinet
Integrate PCS+STS+battery+EMS+fire protection system in one box, footprint only 1.4㎡
Max. 10 units in parallel in off-grid mode, no limit in on-grid mode
IP55 for outdoor installation(IP66 for battery compartment), C4 anti-corrosion (C5 optional)
8000 cycles of battery lifespan, cell temperature difference<3℃
Reduces system investment, saves cabling, reduces losses
Supports 100% three-phase unbalanced load and 110% overload in 10 mins
Supports AI-driven revenue optimization based on dynamic electricity prices
Level 3 BMS+module-level fire protection+explosion protection+leakage current detection
≤10ms switchover time when grid cuts off, seamless switch also functional in peak-shaving mode
125 kW
261kWh
52.2kWh
728~936V
220/380Vac, 230/400Vac
3L/N/PE
IP66/IP55
Product Consultant 1v1 Service
Free Product Solutions
Professional Team Meticulous Answer
Leave your contact to download the insights from the event. Furthermore, we will contact to provide more details on your product(s) of interest.
© 2024 Shenzhen ATESS Power All Rights Reserved. 粤ICP备2023127387号 by GrowthMan