Against the backdrop of the global energy transition, energy storage power stations in remote areas have become critical pillars of power supply. However, challenges such as high altitude, rugged terrain, volatile climates, and limited communications have consistently driven up operation and maintenance (O&M) costs. Drawing on project experience in over 95+ countries worldwide, ATESS combines intelligent O&M technology with localized service support to help clients reduce costs and improve efficiency across the entire project lifecycle.
When designing an energy storage system, the motor load is always a headache due to its large starting current. Sometimes it could be up to 8 times the rated current. To ensure the system's normal operation, The only solution is to choose a bigger power of inverter , and the system cost thus increases.
In certain areas with the TN-SC power grid, such as the UK, Earthing for EV chargers has always been a pain due to the high cost. The neutral line and the system grounding protection line are combined into a PEN line. The PEN line applies a multi-point grounding method in the transmission line. If the PEN line is disconnected, it will produce a voltage between the PEN break point and the earth. When an EV charger is connected at the end, equivalently there is a voltage difference between its metal shell and the earth. When the voltage difference exceeds the safety voltage to the human body, the user is at high risk of a shock hazard when touching the shell.
Years of war has severely damaged Cambodia’s power sector, the inducing high electricity price and low energy access has closely impacted local factories’ production capacity, profit etc. One garment factory there used to rely on a 400KVA power grid transformer, yet the whole factory peak load was 600KW, so the diesel generator had to be turned on when load capacity exceeded 400KW. Extra high expense and pollution caused by the generator are also headaches. To resolve such problem and maximize production profit, owner of the factory opted to utilize their abundant light resources, to retrofit his existing power system to an ATESS integrated solar energy storage system.
Why do we need load balance when using multiple chargers?
When install multiple chargers in public stations, if the output power of these chargers is not managed, the total power might exceed the maximum power of the power distribution switch and cause a trip. Therefore, performing load balance for multiple chargers is a must.