A professional solution provider for industrial energy storage and electric vehicle charging piles
12
+years of experience in ESS
31,600
m²industrial park
25,000
m²manufacturing plant
Analysis:The active power of a certain phase is greater than 1.3 times, 1.2 times, and 1.1 times the limit value.
Solution:Reduce load
Analysis:Grid frequency over frequency/grid frequency under frequency.
Solution:Check if the frequency setting in the protection parameters is correct.Waiting for the grid frequency to be normal
Analysis:The AC voltage of a certain phase is greater than 1.4 times the rated voltage or the safety protection value/less than the safety protection value or 0.5 times the rated voltage.
Solution:Waiting for the three-phase voltage to return to normal
Analysis:The d-axis voltage is less than 60% of the effective value of the grid voltage, or the phase sequence is connected incorrectly.
Solution:Wait for the grid voltage to return to normal. Or adjust the order of three-phase connection
Analysis:AC slave contactor failure reported three consecutive times
Solution:Contact after-sales personnel to replace the contactor with a new one
Analysis:Three consecutive reports of AC main contactor failure.
Solution:Contact after-sales personnel to replace the contactor with a new one
Analysis:Three consecutive reports of DC auxiliary contactor failure.
Solution:Contact after-sales personnel to replace the contactor with a new one
Analysis:Three consecutive reports of DC main contactor failure.
Solution:Contact after-sales personnel to replace the contactor with a new one
© 2024 Shenzhen ATESS Power All Rights Reserved. 粤ICP备2023127387号 by GrowthMan